Thats the way to go ray new cam bearing rod and main bearings and rings make shore you whone the cylinders and cut the ridge if there is one you got a good start that motor looks like it was in good shape the start with
ordered the resr of the parts needed to drop the motor in. should be here monday, tuesday the latest. i started prepping the engine bay so it will be ready when the motors ready. its cleaning up nice, but takes forever to clean up. heres some comparison pics.
did more work on the engine bay. driver side headlights wires are completely hiddin instead od running above the frame rail. grinded down all the serface rust and primed.
motors all together except the rocker studs. i have to take these off and switch with smaller ones. looking to drop in the camaro by the end of the week. heres a pic of the carb fuel line kit and valve cover t bars